Standard Description
Equipped together with the zero leak bidirectional checking sole-noid valves, this electrical power unit is developed for your operation of two independent circuits. Which are respectively for that main and subordinate platforms of your double scissors lift. Two cut-off valves are utilised for lowering the machine manually in situation of energy loss. If additional independent circuits are required to your application please get hold of us for availability.
Remark: 1. Please talk to our sales engineer for that various pump displacement, motor power or tank capability.
2. CSA or UL licensed motors are available upon request.
Specific Notes
one. The AC motor is of S3 duty cycle, which can only operate intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean each of the hydraulic parts concerned in advance of installation of the energy unit.
3. Viscosity on the oil shoud be 15~46 cst,along with the oil really should be clean and cost-free of impurities,N46 hydraulic oil is suggested.
4. The energy unit ought to be mounted vertically.
5. Check the oil degree during the tank after the first working of your power unit.
6. Oil altering is required immediately after the original a hundred operation hrs,afterwards as soon as each 3000 hrs.